Case Stories | Power Team Hydraulic Solutions

Hydro Power Plant Rotor Maintenance Using a Power Team’s Synchronized Hydraulic Lifting System

Written by HT Marketing Group | Oct 13, 2026, 6:23:40 AM

1. Estimated versus sequential or mechanical lifting methods for comparable rotor maintenance projects; not a measured result. 

2. Estimated from automated multi-point control versus manual setup and alignment on comparable jobs; not a measured result. 

3. Based on reported project rotor separation duration reduction from approximately 3 weeks to 1 hour.