1. Estimated versus sequential or mechanical lifting methods for comparable rotor maintenance projects; not a measured result.
2. Estimated from automated multi-point control versus manual setup and alignment on comparable jobs; not a measured result.
3. Based on reported project rotor separation duration reduction from approximately 3 weeks to 1 hour.