1. Estimated using a $30-$45 hourly labor rate over 50 operating weeks per year; actual savings vary by local rates and schedule.
2. Based on 1-3 minutes saved per bale across roughly 20 lifts per day, equating to an estimated 20-60 minutes saved daily.
3. Estimated from eliminating tractor hydraulic hookup and repositioning steps per cycle; not a measured result for this unit.