Shop Equipment
Power Team
Industrial
An Automated 200T Hydraulic Press
Precision Hydraulic Pressing for F1 Flywheel Manufacturing
Document Navigation
Overview
A specialized manufacturer needed a compact and repeatable method for installing inserts into carbon fiber flywheels used in Formula 1 powertrains. A Power Team hydraulic press system delivered controlled, shock-free force while protecting delicate composite components.
The Challenge
Mechanical fly presses could not provide the controlled and repeatable pressure required for carbon fiber insert installation. The manufacturer also faced production bottlenecks, limited floor space, budget constraints, and zero-defect quality expectations.
Solution Presented
Hydraulic Technologies supplied a turnkey system using an SPM256C frame press, a 60846 pedestal, and a PA6 air pump. A customer-provided mandrel distributed force evenly across the inserts. The compact vertical configuration delivered steady hydraulic pressure without the abrupt impact associated with mechanical presses.
Results
The hydraulic press improved insert consistency and reduced the risk of damage to carbon fiber components. The compact system fit the available floor space, provided repeatable force application, and supported high-precision flywheel production without requiring complex hydraulic or electric power equipment.
Other Applications
• Carbon fiber component assembly
• Precision insert installation
• Composite manufacturing
• Tight-tolerance press-fit assembly
• Compact production workcells
Key Metrics
System Impact & Engineering Advancements
Performance Metrics & Key Achievements
Precision Insert Installation
Reduced Composite Damage
Compact Press Footprint
Repeatable Force Control
Related Projects in Construction
Shop Equipment
Power Team
Industrial
High-Force Power Team Press for Product Qualification
Power Team
Transportation
Pumps
Aerospace Riveting with High‑Pressure Hydraulic Power Pumps
Ready to Get Started?
Connect with our team and find the right hydraulic solution for your application.
Need help with your application?
Contact Our Team
Fill out the form below and our engineering team will get back to you within 24 hours.
- 1
- 2